Road Mapping
Helen Strong
Road Mapping: Purpose
This model provides shorthand, graphic communication of the strategic vision and required actions to move an organization from one set of circumstances to another. A road map is generated when there is a need to identify and control the people, actions, resources, and timescale required for a project or change process.
Road Mapping: Structure and Description
The approach can be applied at many levels within the organization. An overall strategic plan would include the activities of each and every department, whereas a road map for training (say) may only need to include the departments and individuals for whom training is necessary (Figure 28.1).
Three key questions are asked when building a road map for action.
- Where do we want to go?
- Where are we now?
- How can we get from here to where we want to be?
The plan can take account of integration of the entire organization in cooperating to bring about change.
The road map can be used as a work in progress plan, recognizing that in the longer term the situation may change and the destination needs to adjust to significant influences that enter the market.
Figure 28.1 One form of a road map based on the concept of a Gantt chart
Road Mapping: Strategic Considerations
The process plays an important part in clarifying the required objectives and resources to implement change. This model provides the picture of the direction and cooperation required by various departments to achieve the organization’s objectives. A simplified or overview version can be used to communicate the overall objectives to people who are not directly involved in the plan’s implementation. In this way, the support of the entire organization can be energized toward the goals.
Development of road mapping requires the participation of different disciplines, and should result in better understanding of each other’s needs. For example, marketing will realize the type of brief required by production to meet their specification of a consumer product. In turn, production will have a better appreciation of the realities of the marketplace.
The map helps to define work flows and responsibilities for action. An important outcome of mapping is that resource demand and capacity overloads are easily anticipated from an efficient plan. Coordination of activities is possible following the road map time lines. It is also possible to track the progress of the project since achievement milestones are usually included on the charts.
It is a tool to bring people out of their silos, emphasizing the impact that completion of their work will have on the longer term implementation of new products, the introduction of technology, and so on.
Road Mapping: Implementation
Development of a Gantt chart is one form of road mapping. However, it does not necessarily have to be the only visual representation of the path of a project.
To have a road map, the process confirms the objectives, identifies task areas, and allocates responsibilities to people who develop the detailed plans for implementation of the broadly defined tasks. A road map should indicate the interrelatedness and interdependence of activities across different departments.
Even though it is represented as the destination in the model, the first question that needs to be asked is: Where do we want to be?
To help answer this important question, the researcher therefore needs to:
- Keep abreast of the organization’s performance and strategic intentions.
- Indulge in daily environmental scanning searching for innovation industry trends.
- Regularly conduct consumer researchG to be in touch with trends and how target market preferences are moving. What are they doing that is different? How are tastes changing? What else are they using to fulfill the functions that our products currently meet?
- Depending on the nature of the objective, feasibility studies may need to be conducted. These would test the viability of product launches, or perhaps examine the need to adjust the marketing mix.
- If there is a new concept, then it also needs to be tested in the marketplace to see the reaction within the target market(s) including their intention to purchase, use the product or serviceG or do both.
In the next step in the implementation of the model, the researcher will review the events that have taken place to lead to the decision as to the destination for the road map. He or she will ask whether there are pointers in the problem context that indicate issues or opportunities that should be taken into account in building the strategies and action plans to move the organization to its goal.
This is a good juncture to involve the various departments and obtain their input for:
- Agreement regarding interpretation of the trends within the organization and its environment
- Evaluating the destination or goal
- Agreeing to the best strategy
- Formulating a broad (outline) plan for implementation
- An audit of existing resources
- Risk analysis and possible mitigation measures
The appointed project manager will be responsible for driving the development of the detailed plan. This will include:
- Confirming stakeholder needs and interests in the project
- Setting specific; measurable; actionable; realistic; time defined (SMART) objectives
- Determining what inputs and resources are required
- Estimating and obtaining authorization for the required budget
- Development and implementation of a communication plan
- Estimating timing
- Allocating individual responsibilities for completion of tasks along the way.
As in a normal project management, there will be performance standards and quality controls put in place, and milestones to mark the progress of the plan.
Hence along the way the researcher will require the following information:
- A copy of the plan with its clearly stated objectives and monitoring plan
- Market indicators that may influence the direction and even the final destination of the road map
- Status reports (exception and progress reports) relative to the planned activities and the project milestones
- Financial report (expenditure vs. budget)
- Quality monitoring statistics
Within the project plan, there will usually be a clearly defined handover or agreement as to when the destination has been reached.
Road Mapping: Conclusions
To maintain its usefulness, the road map needs to be current (updated frequently). If changes in the situation are known, problems can be anticipated and mitigating action taken to avoid them.
This technique provides a template for long-term management of projects in many fields. The combined discipline of analysis and involvement of all affected parties ensures the best chance of integrating activities and reaching one’s objectives. To smoothen the path, the project manager needs to ensure there is buy-in to the vision and that there are sufficient resources to support the activities. He or she should use such projects as an opportunity for increasing morale by building in rewards for results and celebration of achievements.
References
Ahonen, T.T. 2013. “Around the World With Mobile: Global Insights and Regional Relevance of Mobile Marketing.” Presented at MMA Forum: Mobile’s Role in the Path to Purchase, New York, May 8 – 10. New York: Mobile Marketing Association. Available from: http://www.slideshare.net/vivastream/around-the-world-with-mobile-global-insights-and-regional-relevance-of-mobile-marketing-20847876
Bae, Y.H. 2012. Three Essays on the Customer Satisfaction–Customer Loyalty Association http://ir.uiowa.edu/etd/3255 (accessed July 3, 2013).
Barron, P. 2013. Force Field Analysis http://www.change-management-consultant.com/force-field-analysis.html (accessed October 22, 2013).
Bernstein, D. 2011. Value Proposition: A Free Worksheet to Help You Win Arguments in Any Meeting http://www.marketingexperiments.com/blog/general/value-proposition-worksheet.html (accessed July 10, 2013).
Boston Consulting Group. 1973. “The Experience Curve–Reviewed IV.” The Growth Share Matrix or The Product Portfolio, http://www.bcg.com/documents/file13904.pdf (accessed May 25, 2014).
Clayton Christensen Institute. 2012. Disruptive Innovation, http://www.christenseninstitute.org/key-concepts/disruptive-innovation-2/ (accessed July 17, 2013).
Content Marketing Institute, 2011, What is Content Marketing?, Cleveland,
Z Squared Media LLC. Available from: http://contentmarketinginstitute.com/what-is-content-marketing/ (accessed May 19, 2014).
Eslkevin’s Blog. May 16, 2013. Hofstede’s Cultural Dimensions Theory, http://eslkevin.wordpress.com/2013/05/16/hofstedes-cultural-dimensions-theory/ (accessed September 9, 2013).
Fleishman-Hillard and Lepere Analytics. 2013. The Authenticity Gap: Managing Expectations and Experience, http://fleishmanhillard.com/wp-content/uploads/meta/resource-file/2013/authenticity-gap-executive-summary-1367433000.pdf (accessed September 16, 2013).
Fu, B.; and T.P. Labuza. 2000. Shelf Life Testing: Procedures and Prediction Methods for Frozen Foods. St Paul, MN: University of Minnesota. http://www.google.co.za/url?sa=t&rct=j&q=&esrc=s&source=web&cd=6&cad=rja&ved=0CEYQFjAF&url=http%3A%2F%2Fwww.researchgate.net%2Fpublication%2F2402471_Shelf_Life_Testing_Procedures_and_Prediction_Methods_for_Frozen_Foods%2Ffile%2F9fcfd50ca4182953af.pdf&ei=G6rSUpTEIOHL0QW6wYGIBA&usg=AFQjCNF8mnmqOlASQwMO3-i2K_dcOMaEsA&bvm=bv.59026428,d.bGQ (accessed January 12, 2014).
Greenberg, M. 2009. Do the Math: An Easy Formula to Forecast Customer Growth, http://venturebeat.com/2009/08/25/do-the-math-an-easy-formula-to-forecast-customer-growth/ (accessed August 18, 2013).
Gunelius, S. 2011. Brand Equity Basics – Part 1: What Is Brand Equity?, http://aytm.com/blog/research-junction/brand-equity-basics-1/ (accessed June 3, 2013).
Jarvis, B. n.d. Conjoint Analysis 101, http://www.pragmaticmarketing.com//resources/conjoint-analysis-101?p=0 (accessed August 18, 2013).
Johnston, J. 2012. How Volvo Construction Uses Digital Marketing to Fuel Sales, http://www.marketingsherpa.com/video/volvo-digital-marketing-fuel-sales (accessed August 20, 2013).
Keaveney, S. April 1995. “Customer Switching Behavior in Service Industries: An Exploratory Study.” Journal of Marketing 56, no. 2, pp. 71–82.
Keller, K.L. 1999. Blending Branding Theory & Practice: Insights & Lessons from Applying the Brand Resonance Model, http://www.docstoc.com/docs/108016293/BLENDING-BRANDING-THEORY-and-PRACTICE (accessed May 25, 2014).
Keller, K.L. 2006. “Measuring Brand Equity.” The Handbook of Marketing Research: Uses, Misuses, and Future Advances, eds. R. Grover; and M. Vriens. Thousand Oaks, CA: Sage publication.
Keller, K.L. 2010. The New Branding Imperatives: Insights for the New Marketing Realities, http://exec.tuck.dartmouth.edu/downloads/350/msi_ff_10-700.pdf
(accessed June 3, 2013).
King, D. 2005. Ge 1300. Introduction To Human Geography Lecture 15. Location of Industry, http://www.csiss.org/classics/archive/lect15.htm (accessed September 12, 2013).
Kirby, J. 2013. A Unique Approach to Marketing Coca-Cola in Hong Kong, http://blogs.hbr.org/hbr/hbreditors/2013/02/a_unique_approach_to_marketing_coca_cola_in_hong_kong.html?utm_source=feedburner&utm_medium=feed&utm_campaign=Feed%3A+harvardbusiness+%28HBR.org%29 (accessed July 15, 2013).
Klepper, S. 1997. “Industry Life Cycles.” Industrial and Corporate Change, Vol 6, No. 1, pp. 145–180.
Kotler, P. 2000. Marketing Management, Millennium Edition. Upper Saddle River, NJ: Prentice-Hall, Inc.
KugytÄ—, R.; and L. Å liburytÄ—. 2005. “A Standardized Model of Service Provider Selection Criteria for Different Service Types: A Consumer-Oriented Approach.” ISSN 1392-2785 Engineering Economics 43, no. 3.
Kussmaul, M. 2012. Marketing: The Four P’s or the Four C’s, http://www.marketplacemotivations.com/articles/magazine-articles/54-marketing-the-four-p-s-or-the-four-c-s (accessed September 9, 2013).
Lasswell, M. 2004. Lost in Translation Time and Again, Product Names in Foreign Lands Have Come Back to Haunt Even the Most Brilliant of Marketers, http://money.cnn.com/magazines/business2/business2_archive/2004/08/
01/377394/ (accessed September 9, 2013).
Levitt, T. July–August. 1960. “Marketing Myopia.” Harvard Business Review 38, no. 4, pp. 45–56.
McClaren, D. 2013. Nike Takes Gamification to the Next Level with Nike Fuel Missions, http://www.theuksportsnetwork.com/nike-takes-gamification-to-the-next-level-with-nikefuel-missions (accessed July 15, 2013).
McSweeney, B. 2002. Hofstede’s Model of National Cultural Differences and Their Consequences: A Triumph of Faith – a Failure of Analysis, http://www.uk.sagepub.com/managingandorganizations/downloads/Online%20articles/ch05/4%20-%20McSweeney.pdf (accessed September 6, 2013).
MindTools.com. n.d. a. Porter’s Five Forces Assessing the Balance of Power in a Business Situation, http://www.mindtools.com/pages/article/newTMC_08.htm (accessed December 31, 2013).
MindTools.com. n.d. b. Cost-Benefit Analysis, http://www.mindtools.com/pages/article/newTED_08.htm (accessed January 6, 2014).
MSG. n.d. Brand Equity – Meaning and Measuring Brand Equity, http://www.managementstudyguide.com/brand-equity.htm (accessed June 3, 2013).
Mullins, J. 2013. The New Business Road Test: What Entrepreneurs and Executives Should do Before Launching a Lean Start-Up. London: FT Publishing.
Nichols, W. March 2013. “Advertising Analytics 2.0.” Harvard Business Review, 91, no. 3, pp. 60–68.
Olenski, S. 2012. The Engagement Marketing Disconnect Between Consumers and Brands Rages On, http://www.forbes.com/sites/marketshare/2012/11/26/the-engagement-marketing-disconnect-between-consumers-and-brands-rages-on/ (accessed August 19, 2013).
Palmer, D.; S. Lunceford; and A.J. Patton. 2012. The Engagement Economy: How Gamification Is Reshaping Businesses, http://dupress.com/articles/the-engagement-economy-how-gamification-is-reshaping-businesses/ (accessed July 10, 2013).
Parasuraman, A.; V. Zeithaml; and L. Berry. Fall 1985. “A Conceptual Model of Service Quality and Its Implications for Future Research.” Journal of Marketing 49, no. 4, pp. 41–50.
Parnitzke, J. 2013. How to Build a Roadmap – Gap Analysis, http://pragmaticarchitect.wordpress.com/2013/06/11/how-to-build-a-roadmap-gap-analysis/ (accessed August 20, 2013).
Pearson Education. 2013. Culture: The Nature of Culture, http://www.infoplease.com/encyclopedia/society/culture-the-nature-culture.html (accessed September 6, 2013).
Perner, L. 2013. Segmentation, Targeting and Positioning, http://www.consumerpsychologist.com/cb_Segmentation.html (accessed October 7, 2013).
Personal.psu.edu. 2001. Roger’s Diffusion of Innovations, http://www.personal.psu.edu/users/w/x/wxh139/Rogers.htm (accessed October 9, 2013).
Point of Purchase Advertising International (POPAI). 2012. 2012 Shopper Engagement Study Media Topline Report. Chicago: The Global Association for Marketing at Retail, http://www.popai.fr/textes/Shopper_Engagement_Study.pdf (accessed March 11, 2014).
Pulse Group PLC. 2009. Consumer Brand Loyalty in a Recession Final, http://www.slideshare.net/bobchua/consumer-brand-loyalty-in-a-recession-final (accessed August 18, 2013).
Rogers, E.M. 1995. Diffusion of Innovations. 4th ed. New York, NY: The Free Press.
Ryan, M.; A. Sleigh; K.W. Soh; and Z. Li. 2013. Why Gamification is Serious Business, http://www.accenture.com/us-en/outlook/Pages/outlook-journal-2013-why-gamification-is-serious-business.aspx (accessed July 10, 2013).
Sawtooth Software. n.d. What is Conjoint Analysis?, http://www.sawtoothsoftware.com/products/conjoint-choice-analysis/conjoint-analysis-software (accessed August 22, 2013).
Sawtooth Technologies. n.d. Perceptual Mapping, http://www.sawtooth.com/index.php/consulting/overview/perceptual-mapping (accessed August 22, 2013).
Shipham, S.O. 2010. “The MBA Research Process: Some Theoretical Considerations.” Management Today 28, no. 6, pp. 49–50.
Silverman, G. 2000. What to Do When Quantitative and Qualitative Research Contradict Each Other, http://www.quirks.com/articles/a2000/20001201.aspx?searchID=808886082&sort=9 (accessed September 10, 2013).
Smith, P.R. 2011. SOSTAC® Guide to Writing The Perfect Plan, www.prsmith.org; www.facebook.com/prsmithmarketing
Sorenson, L. 2011. 6 Core Benefits of Well-Defined Marketing Personas, http://blog.hubspot.com/blog/tabid/6307/bid/29583/6-Core-Benefits-of-Well-Defined-Marketing-Personas.aspx (accessed September 9, 2013).
Stevens, G. n.d. Product Lifecycle | Do You Know Where Your Business Is?, http://www.beasuccessfulentrepreneur.com/product-lifecycle-do-you-know-where-your-business-is/ (accessed December 31, 2013).
Stinson, J.E.; and W.A. Day. 1990. Developing Competitive Strategy, http://www.ouwb.ohiou.edu/stinson/Developing Strategy.html (accessed July 22, 2013).
Sunshine, J. 2012. 11 Brand Names That Sound Hilarious in a Different Language, http://www.huffingtonpost.com/2012/08/10/lost-in-translation-brands_n_1765812.html#slide=1362544 (accessed December 30, 2013).
Thomas, J.W. 1993. Product Testing, http://www.decisionanalyst.com/publ_art/prodtes1.dai (accessed July 10, 2013).
Thompson, R. n.d. Stakeholder Analysis: Winning Support for Your Projects, http://www.mindtools.com/pages/article/newPPM_07.htm (accessed August 20, 2013).
Wartzman, R. 2009. Authentic Engagement, Truly, http://www.businessweek.com/managing/content/dec2009/ca2009123_747440.htm (accessed October 7, 2013).
Wikimedia Commons. 2007. File:Servqual NL.gif, http://commons.wikimedia.org/wiki/File:Servqual_NL.gif?uselang=en-gb# (accessed January 7, 2014).
Wikipedia. 2012 a. Brand Equity, http://en.wikipedia.org/wiki/Brand_equity (accessed September 12, 2013).
Wikipedia. 2012 b. Ishikawa Diagram, http://en.wikipedia.org/wiki/Ishikawa_diagram (accessed October 7, 2013).
Wong, K.C. 2011. Using an Ishikawa Diagram as a Tool to Assist Memory and Retrieval of Relevant Medical Cases from the Medical Literature, http://www.jmedicalcasereports.com/content/5/1/120 (accessed October 9, 2013).
Zhang, K.Z.K.; C.M.K. Cheung; and M.K.O. Lee. 2012. “Online Service Switching Behavior: The Case of Blog Service Providers.” Journal of Electronic Commerce Research 13, no. 3, http://www.csulb.edu/journals/jecr/issues/20123/paper1.pdf (accessed January 20, 2014).
Zimmermann, A.; and C. Maennling. 2007. Mainstreaming Participation, http://www.fsnnetwork.org/sites/default/files/en-svmp-instrumente-akteuersanalyse.pdf (accessed October 13, 2013).
Additional Sources
Ballou, R.H. 2006. The Evolution and Future of Logistics and Supply Chain Management, http://www.scielo.br/scielo.php?script=sci_arttext&pid=S0103-65132006000300002&lng=en&nrm=iso (accessed September 12, 2013).
Chronostrategy. n.d. ADL Matrix, http://chronostrategy.wikispaces.com/ADL+Matrix (accessed January 5, 2014).
Fruin, M. 2013. Competitive Strategy and Industry Environment, www.cob.sjsu.edu/fruin_m/Spring2013/ppt/chapter6.ppt (accessed July 20, 2013).
Gartner, Inc. 2011. Gartner Predicts Over 70 Percent of Global 2000 Organisations Will Have at Least One Gamified Application by 2014, http://www.gartner.com/newsroom/id/1844115 (accessed July 15, 2013).
Gurel-Atay, E.; G.-X. Xie; J. Chen; and L.R. Kahle. March 2010. “Changes in Social Values in the United States: 1976-2007 ‘Self-Respect’ Is on the Upswing as ‘A Sense of Belonging’ Becomes Less Important.” Journal of Advertising Research 50, no. 1, pp. 57–67.
Harquail, C.V. 2009. 7 Core Principles for Authentic Engagement, http://authenticorganizations.com/harquail/2009/05/11/7-core-principles-for-authentic-engagement/ (accessed October 6, 2013).
Hugos, M.H. 2011. Essentials of Supply Chain Management, 3rd ed. New York, NY: Wiley.
Kirkpatrick, D. 2011. B2B Gamification: Bold Strategy in Conservative Industry Increased Website Visits 108.5%, http://www.marketingsherpa.com/article/case-study/bold-strategy-in-conservative-industry (accessed July 16, 2013).
Kirkpatrick, D. 2012. Gamification: 6 Tactics for B2B Marketers, http://www.marketingsherpa.com/article/how-to/6-tactics-b2b-marketers (accessed July 10, 2013).
Lee, M. 2007. Book Summary: Crossing the Chasm by Geoffrey Moore, http://bizthoughts.mikelee.org/book-summary-crossing-the-chasm.html (accessed July 23, 2013).
Mullins, J. 2010 a. Markets and Industries: What’s the Difference and Why Does it Matter?, http://www.europeanbusinessreview.com/?p=2366 (accessed August 20, 2013).
Mullins, J. 2010 b. The New Business Road Test: What Entrepreneurs and Executives Should Do Before Writing a Business Plan. 3rd ed. London: Prentice Hall.
ODI. 2009. Planning Tools: Stakeholder Analysis, http://www.odi.org.uk/publications/5257-stakeholder-analysis (accessed August 20, 2013).
Olsen, Z. 2013. Product Adoption Curve Marketing, http://www.bydatabedriven.com/product-adoption-curve-marketing/ (accessed July 19, 2013).
Pressley, M.M. 2008. “Chapter 7: Competitive Strategy and the Industry Environment.” http://college.hmco.com/hjinstruct/powerpt/ch07/sld001.htm (accessed July 22, 2013). (Taken from Hill, C.W.L.; and G.R. Jones. 2008. Strategic Management: An Integrated Approach. Houghton Mifflin Company.)
Saltlane. 2009. Stakeholder Analysis http://www.saltlane.co.uk/Resources/stakeholder%20analysis.HTML (accessed August 20, 2013).
SCOR. 2013. What is SCOR?, http://supply-chain.org/scor (accessed September 15, 2013).
See also: www.newbusinessroadtest.com; www.johnwmullins.com
Supply Chain Management Institute. 2008. The Supply Chain Management Process, http://www.ijlm.org/Our-Relationship-Based-Business-Model.htm (accessed September 9, 2013). (The diagram comes from the book Lambert, D.M. 2008. Supply Chain Management: Processes, Partnerships, Performance, 3rd ed. Ponte Vedra Beach, FL: Supply Chain Management Institute .)
Toy, T. 2013. How To Develop a Killer Marketing Plan, Methods Used, General Rules, Six Key Steps, Business Models And Samples, http://tommytoy.typepad.com/tommy-toy-pbt-consultin/2013/04/how-to-develop-a-killer-marketing-plan-methods-used-general-rules-six-key-steps-business-models-and-samples.html (accessed August 23, 2013).
Walker, D.; A. Shelly; and L. Bourne. 2008. Influence, Stakeholder Mapping and Visualization, www.researchgate.net/publication/24078124_Influence_stakeholder_mapping_and_visualization/file/d912f (accessed August 20, 2013).
Wikipedia. 2013. Hofstede’s Cultural Dimensions Theory, http://en.wikipedia.org/wiki/Hofstede%27s_cultural_dimensions_theory (accessed September 2, 2013).
Willcocks, L.P.; S. Cullin; and M.C. Lacity. 2007. The Outsourcing Enterprise The CEO Guide to Selecting Effective Suppliers, http://www.outsourcingunit.org/publications/Selecting_Effective_Suppliers.pdf (accessed September 15, 2013).

